Through the close combination of cement clinker calcination technology and waste heat power generation technology, Xipu Group provides the optimal solution of pure low temperature waste heat power generation.The company has rich experience in project construction and management, and can undertake engineering construction projects through new construction, renovation, commissioning and contracting operation, and serve the owners with professional technology and construction team.
The company has undertaken several items of waste heat power generation projects in EPC mode, the double pressure system scheme of low temperature waste heat power generation of 5000 / d new dry process cement production line, equipped with 9MW steam turbine generator set, making the generating capacity of tons of clinker reach 38.88kWh/t.cl.Hubei Laifeng waste heat power generation project, Lafaji River oil waste power project also reached more than 300 ton of clinker power generation 38kWh.